Scope: Technical, administrative, financial, legal, social and environmental auditing for the adaptation of 6th Street to the Transmilenio system in the section between the Caracas and NQS trunk roads, including the intersection 6th Street – NQS, in Bogotá D.C.
Click on image to zoom
Challenges
Supervision of the construction of the first roundabout at the third level. We participate in the optimization of construction times.
35- and 50-meter-deep piling construction with state-of-the-art seismic isolators.
Construction of the TL5 metal barriers with North American technology to reduce the risks of the Transmilenio operation.
Construction of the ‘Pipe Jacking’ system and spillway for the pluvial and sanitary network.
Geotechnical monitoring to control the movement of structures.
Construction of two Transmilenio stations.
Disassembly and assembly of the metallic pedestrian bridge, located in the NQS with 6th street.
Additional Services
Review and adjustments to the received designs, which allowed to deliver concepts to the contracting entity and contractors so that the designs will improve.
Supervision of the construction of stations (buildings).
Inspection of water and basic sanitation: review of designs and supervision of works.